Skip to main content
Figure 7 | Radiation Oncology

Figure 7

From: Initial investigation using statistical process control for quality control of accelerator beam steering

Figure 7

Process control chart warning results. Bars indicate the number of days prior to failure that an action level threshold was first triggered for each of the monitored steering coil parameters. A - High Alarm triggered indicating parameters exceeding ± 6 standard deviations of the mean weekly sample value. B - Low alarm indicating the observation of nine consecutive weekly samples on one side of the mean. C - Low alarm indicating the observation of two out of three consecutive weekly samples greater than two standard deviations from the mean but not exceeding the high alarm limit.

Back to article page