Skip to main content

Table 2 Interventions resulting from the FMEA process

From: A bi-institutional multi-disciplinary failure mode and effects analysis (FMEA) for a Co-60 based total body irradiation technique

Rank

Failure mode

Preventative measure

A: K C I—F M E A

 1

Patient moves after setup (with lung blocks)

Increased attentiveness to patient motion—one therapist assigned solely to monitoring patient motion

 2

Setup error (significant wrt tx field)

Check of treatment field via light field visualization prior after setup and prior to treatment

 3

Calculation error

Second check of calculation by physicist

 4

Couch is accidentally shifted after morning QA (shift insignificant wrt tx field)

Therapists check couch location again after patient setup and prior to treatment

 5

Program wrong tx time

Time out and double check by second therapist

 6

Patient moves after setup (significant move wrt tx field) (no lung blocks)

Increased attentiveness to patient motion—one therapist assigned solely to monitoring patient motion

 7

Used prone time for supine position or vice versa

Time out and double check by second therapist

 8

Timer malfunction

Set stopwatch as secondary timer for all multi-fraction cases

 9

Missing lung blocks (one fraction)

Time out and double check by second therapist

 10

Incorrect documentation (patient positioning)

Measurements rechecked during setup on each treatment day

 11

Incorrect lung block design/size

Evaluation of lung block size and shape prior to first treatment

 12

Forget to flip to supine after prone field

Time out and double check by second therapist

 13

Incorrect mx

Measurements rechecked during setup on each treatment day

 14

Corrupt spreadsheet

Checked against manual calculation for all treatment fields

 15

Image from wrong date is used for alignment verification

Lung blocking evaluated against anatomy on the current blocked image

 16

Patient has too many blankets covering them

Checked prior to treatment

 17

Incorrect documentation (patient measurements)

Measurements rechecked during setup on each treatment day

 18

Couch is accidentally shifted after morning QA (shift significant wrt tx field)

Therapists check couch location again after patient setup and prior to treatment

 19

Images saved under wrong patient

Lung blocking evaluated against anatomy on the current blocked image

 20

Miscommunication of Rx

Physicist checks BMT physician’s treatment note in addition to RO physician’s treatment note

B. D F B W – F M E A

 1

Corrupt spreadsheet

Calculation performed by both a commissioned Java application and a spreadsheet

 2

Neglect to subtract in-vivo delivery time from remaining tx time

Time out and double check by second therapist

 3

Setup error (significant wrt tx field)

Check of treatment field via light field visualization after setup and prior to treatment

 4

Program wrong tx time

Time out and double check by second therapist

 5

Incorrect compensator placement

Compensator placement is checked before treatment with MV imaging

 6

Calculation error

Two independent calculations are performed, one by dosimetry one by physics

 7

Incorrect treatment date

Correct dates are second checked during physics check and therapist plan check

 8

Miscommunication of Rx

Physics 2nd check compares planned dose to prescription

Therapist plan check compares planned dose to prescription

 9

Incorrect documentation in EMR

Fractionation checked against a protocol list

 10

Timer malfunction

Secondary timer used during all treatments

 11

Plan changed after checks but before approval on tx day

Timeout compares planned dose to prescription on tx day

 12

Flattening filter partially inserted

Flattening filter position checked during morning QA

 13

Flattening filter inserted but not latched

Flattening filter position checked during morning QA

 14

Incorrect compensator

Compensators are checked against plan during therapist plan check

 15

Incorrect documentation

Plan documentation checked during physics check and therapist plan check

 16

Miscommunication of dates

Correct dates are second checked during physics check and therapist plan check

 17

Wrong flattening filter inserted

The console will interlock if the wrong flattening filter is inserted and distance from the floor to the flattening filter would fail QA if wrong filter was in place

 18

Wrong compensator

Compensators are checked against plan during therapist plan check

 19

Patient moves after setup (significant move wrt tx field) (no lung blocks)

Increased attentiveness to patient motion—one therapist assigned solely to monitoring patient motion

 20

Wrong lung blocks

Lung blocks are checked against plan during therapist plan check

  1. Bold—new intervention resulting from the FMEA; italics—existing QA/QC measure